|
The Basic EAGLE Ticket Transfer System
Eagle's Mark II Air
Lift System is a super-reliable pressure/vacuum system requiring power on one
end of the system in a send/receive station called the "Power Pedestal" that
can be located at either end of the system. The power pedestal moves carriers
under pressure in one direction and under vacuum on the return in a "Push-Pull"
system operation. System design allows the installation of intermediate
stations for greater system usage and flexibility. The special features of the
Mark II System, which is also designed for three inch for inch c diameter air
lift include: Electrical Power at one end of the system, Send/Receive Station
at non-powered end, it makes no noise whatsoever, and it also includes 120 feet of wire.
Eagle Mark II Air-Lift Package Includes:
- Two (2) Stations with Automatic In-Use & Arrival Lights
- Stainless Steel Truck Station
- Safety Locking Doors & Solid State Circuitry
- Two (2) 90-degree Bends, 3" PVC Pipe
- Four (4) 3" x 9" Carriers
- 100 Feet of 3" Straight PVC Tubing
- All Necessary Couplings, Hanging Strap, Hardware, Cement and Cleaner
- 120 Feet of Wiring to Remote Station
- Installation Manual
|
Anti-Overfill System
Existing bin level indicators monitor material level in the
silo. When the material level reaches a level that is considered
safe, the bin level indicator signals the control panel. The
overfill light and horn are activated. When a preset time is
reached (a variable timer is enclosed in the control panel), a
signal activates the pinch valve which stops material flow,
preventing serious damage to the storage silo and dust
collection equipment.
The Anti-Overfill
Package Includes:
- Control Panel with Horn and Light Assembly
- Pinch Valve
- Solenoid Valve with All Fittings
- Two (2) Gaskets
- Two (2) Laser Cut Mating Flanges
- Sixteen (16) Bolts & Locks Washers
- 30 PSI Preset Air Regulator
AVAILABLE MODELS - 4" SYSTEM and 5" SYSTEM
Click Here For A Typical Installation Diagram
|
Trans-Flo Pnuematic Unloader
(Shown with Optional Silencer)
|
The Cement Unloading Package Includes:
|
- TEFC 220-44-/3/60, Class F Motor
- Full Capacity Relief Valve
- Discharge Check Valve
- Air Pressure Gauge
- Heavy Duty Inlet Filter
- Lubricant Level Gauge
- All Pre-Assembled on a Steel Base
|
|
|
Click Here For More Information
30 HP and 40 HP AVAILABLE
OPTIONAL SILENCER PACKAGE
AVAILABLE
|
|
|